Tuesday, September 21, 2010

Sept 21, 2010


All 500+ poles are in place, and mounts have been installed on top of each to hold the solar panel. The ditches are dug, where the wiring will be placed in tubes and buried. Progress is being made. The field sure looks different.

No comments:

Post a Comment